- Scope of Work:
"Inspection
requested for underground pipe extensions completed for the Ground Floor, First
Floor, and Annex Floor as per approved shop drawings and project
specifications."
- Materials:
"All
pipes, fittings, and accessories used are as per approved materials and conform
to project standards. Material submittals have been verified and approved prior
to installation."
- Installation:
"Pipe routing, levels, and slopes have been executed as per IFC drawings and coordinated with structural and architectural elements."
- Testing:
"Pressure/leak
testing (if applicable) for underground piping has been successfully completed
prior to backfilling, with test reports available for review."
- Protection:
"Pipes
have been wrapped/coated/protected (as required) and provided with proper
bedding and surround material as per specification prior to backfilling."
- Identification:
"Identification
markers/tapes installed along the pipe routes for future traceability."
- Verification:
"Requesting
consultant inspection and verification prior to backfilling and concreting
activities."