Reports

📑 All Electrical Reports



1. Project Execution Reports

  • Daily Management Report (DMR) – Daily progress, work done, manpower, and issues.
  • Weekly Progress Report (WPR) – Weekly updates on project activities.
  • Monthly Management Report (MMR) – Summarized project status, issues, and achievements.
  • Electrical Work Completion Report – Confirms project completion.
  • Testing & Commissioning Report – Results of pre-commissioning and commissioning tests.
  • Inspection Test Plan (ITP) Report – Step-by-step inspection with approvals.
  • Site Observation Report (SOR) – Engineer/consultant notes on site deviations.
  • Non-Conformance Report (NCR) – Records deviations from standards.
  • Work Inspection Request (WIR) – Submitted for consultant approval after work completion.


2. Operation & Maintenance Reports

  • Preventive Maintenance Report (PMR)Scheduled maintenance performed.
  • Corrective Maintenance Report (CMR) Repair/replacement due to faults.
  • Breakdown Report Detailed analysis of equipment failure.
  • Shutdown/Outage ReportPlanned shutdown works and safety compliance.
  • Equipment History ReportFull lifecycle record of a specific machine.
  • Load Monitoring Report Trends of power consumption and load demand.
  • Power Quality ReportHarmonics, voltage fluctuations, frequency stability.


3. Testing & Inspection Reports

  • Transformer Testing ReportIR, ratio, vector group, winding resistance, oil test.
  • HT/LT Panel Testing ReportInsulation resistance, high-voltage test, functionality.
  • Cable Testing Report – Megger test, hi-pot test, continuity.
  • Motor Testing Report IR test, winding resistance, no-load test.
  • Relay Testing ReportProtection relay functional testing.
  • Circuit Breaker Testing ReportContact resistance, timing test, insulation test.
  • UPS Testing ReportBattery discharge, autonomy, alarms.
  • Earthing System Test ReportEarth resistance, continuity.
  • Lighting System Test Report Lux level measurement.
  • Generator Test ReportLoad test, insulation, fuel consumption.


4. Safety & Compliance Reports

  • Electrical Safety Audit Report – Workplace compliance with safety standards.
  • Incident/Accident Report – Electrical hazard/fault incident details.
  • Permit-to-Work Report – Authorization for high-risk electrical work.
  • Lockout-Tagout (LOTO) Report – Isolation compliance record.
  • Emergency Drill Report – Testing preparedness of staff.


5. Specialized Reports

  • Energy Audit Report – Energy efficiency and savings analysis.
  • Power Factor Correction Report – PF readings and capacitor bank performance.
  • Voltage Regulation Report – Transformer/regulator performance.
  • Harmonic Analysis Report – Distortion levels in the system.
  • Thermography Report – Hotspots detected by infrared thermal scanning.
  • Lightning Protection System Report – Testing & continuity of LPS.
  • SCADA/Automation Report – Monitoring & control system status.


6. Logbooks (Daily/Periodic Records)

  1. Transformer Logbook
  2. HV Panel Logbook
  3. LV Panel Logbook
  4. UPS Logbook
  5. Motor Logbook
  6. Generator Logbook
  7. Switchgear Logbook
  8. Substation Logbook


Sample Report

📑 Standard Electrical Report Format

1. Report Header

  1. Report Title (e.g., Transformer Testing Report)
  2. Report Number/ID
  3. Date & Time
  4. Location (Project / Substation / Site)


2. Equipment Details

  1. Equipment Name (Transformer, Panel, UPS, Motor, etc.)
  2. Equipment ID/Tag Number
  3. Capacity/Rating (kVA, kW, Voltage, Current)
  4. Manufacturer & Serial Number
  5. Installation Date


3. Work / Test Details

  1. Purpose of Report (Testing, Maintenance, Commissioning, Breakdown, etc.)
  2. Work/Inspection/Test Procedure Description
  3. Standards/References (IEC, IEEE, NEC, NFPA, Local Codes, etc.)


4. Observations & Readings

  1. Test Results (IR values, voltages, current, resistance, PF, etc.)
  2. Measurements (load, temperature, harmonics, lux level, etc.)
  3. Condition Observed (OK, Needs Repair, Replaced, etc.)
  4. Any Deviation from Standard


5. Results & Conclusions

  1. Test Passed / Failed
  2. Defects Observed (if any)
  3. Corrective/Preventive Actions Required
  4. Remarks


6. Approvals & Signatures

  1. Prepared By: __________________ (Engineer/Technician)
  2. Verified By: __________________ (Supervisor/Inspector)
  3. Approved By: _________________ (Client/Consultant)
  4. Stamp/Seal (if required)


👉 This format works for all types of reports (maintenance, testing, inspection, safety, etc.).


Post a Comment

0 Comments