📑 All Electrical Reports
1. Project Execution Reports
- Daily Management Report (DMR) – Daily progress, work done, manpower, and issues.
- Weekly Progress Report (WPR) – Weekly updates on project activities.
- Monthly Management Report (MMR) – Summarized project status, issues, and achievements.
- Electrical Work Completion Report – Confirms project completion.
- Testing & Commissioning Report – Results of pre-commissioning and commissioning tests.
- Inspection Test Plan (ITP) Report – Step-by-step inspection with approvals.
- Site Observation Report (SOR) – Engineer/consultant notes on site deviations.
- Non-Conformance Report (NCR) – Records deviations from standards.
- Work Inspection Request (WIR) – Submitted for consultant approval after work completion.
2. Operation & Maintenance Reports
- Preventive Maintenance Report (PMR) – Scheduled maintenance performed.
- Corrective Maintenance Report (CMR) – Repair/replacement due to faults.
- Breakdown Report – Detailed analysis of equipment failure.
- Shutdown/Outage Report – Planned shutdown works and safety compliance.
- Equipment History Report – Full lifecycle record of a specific machine.
- Load Monitoring Report – Trends of power consumption and load demand.
- Power Quality Report – Harmonics, voltage fluctuations, frequency stability.
3. Testing & Inspection Reports
- Transformer Testing Report – IR, ratio, vector group, winding resistance, oil test.
- HT/LT Panel Testing Report – Insulation resistance, high-voltage test, functionality.
- Cable Testing Report – Megger test, hi-pot test, continuity.
- Motor Testing Report – IR test, winding resistance, no-load test.
- Relay Testing Report – Protection relay functional testing.
- Circuit Breaker Testing Report – Contact resistance, timing test, insulation test.
- UPS Testing Report – Battery discharge, autonomy, alarms.
- Earthing System Test Report – Earth resistance, continuity.
- Lighting System Test Report – Lux level measurement.
- Generator Test Report – Load test, insulation, fuel consumption.
4. Safety & Compliance Reports
- Electrical Safety Audit Report – Workplace compliance with safety standards.
- Incident/Accident Report – Electrical hazard/fault incident details.
- Permit-to-Work Report – Authorization for high-risk electrical work.
- Lockout-Tagout (LOTO) Report – Isolation compliance record.
- Emergency Drill Report – Testing preparedness of staff.
5. Specialized Reports
- Energy Audit Report – Energy efficiency and savings analysis.
- Power Factor Correction Report – PF readings and capacitor bank performance.
- Voltage Regulation Report – Transformer/regulator performance.
- Harmonic Analysis Report – Distortion levels in the system.
- Thermography Report – Hotspots detected by infrared thermal scanning.
- Lightning Protection System Report – Testing & continuity of LPS.
- SCADA/Automation Report – Monitoring & control system status.
6. Logbooks (Daily/Periodic Records)
- Transformer Logbook
- HV Panel Logbook
- LV Panel Logbook
- UPS Logbook
- Motor Logbook
- Generator Logbook
- Switchgear Logbook
- Substation Logbook
Sample Report
📑 Standard Electrical Report Format
1. Report Header
- Report Title (e.g., Transformer Testing Report)
- Report Number/ID
- Date & Time
- Location (Project / Substation / Site)
2. Equipment Details
- Equipment Name (Transformer, Panel, UPS, Motor, etc.)
- Equipment ID/Tag Number
- Capacity/Rating (kVA, kW, Voltage, Current)
- Manufacturer & Serial Number
- Installation Date
3. Work / Test Details
- Purpose of Report (Testing, Maintenance, Commissioning, Breakdown, etc.)
- Work/Inspection/Test Procedure Description
- Standards/References (IEC, IEEE, NEC, NFPA, Local Codes, etc.)
4. Observations & Readings
- Test Results (IR values, voltages, current, resistance, PF, etc.)
- Measurements (load, temperature, harmonics, lux level, etc.)
- Condition Observed (OK, Needs Repair, Replaced, etc.)
- Any Deviation from Standard
5. Results & Conclusions
- Test Passed / Failed
- Defects Observed (if any)
- Corrective/Preventive Actions Required
- Remarks
6. Approvals & Signatures
- Prepared By: __________________ (Engineer/Technician)
- Verified By: __________________ (Supervisor/Inspector)
- Approved By: _________________ (Client/Consultant)
- Stamp/Seal (if required)
👉 This format works for all types of reports (maintenance, testing, inspection, safety, etc.).