Inspection Test Plan (ITP)
What is an ITP?
An Inspection Test Plan (ITP) is a structured document that defines inspection and testing requirements, ensuring compliance with project specifications and industry standards. It helps:
✔ Prevent non-conformance issues
✔ Ensure compliance with project requirements
✔ Maintain safety & reliability
How is an ITP Structured?
An ITP consists of three horizontal columns (Submission, Work, and Tests) and eight vertical rows defining inspection details.
🔹 Submission: Approval of method statements, materials, and shop drawings.
🔹 Work: Execution stages such as installation, termination, and labeling.
🔹 Tests: Verification processes like insulation resistance and continuity tests.
Key Inspection Elements (Vertical Columns)
✅ Activity: Specifies tasks (e.g., MV cable installation).
✅ Acceptance Criteria: Compliance with IEC, IEEE, or ASTM standards.
✅ Controlling Document: Reference specifications & approved drawings.
✅ Action if Not Conforming: Rework, correction, or rejection.
✅ Responsibility: Defines roles (contractor, consultant, third-party inspector).
✅ Frequency: Inspection at milestones or per schedule.
✅ Verification Records: MIRs, RFIs, and test reports.
✅ Inspection Levels: Hold, Witness, Surveillance, and Review points.
ITP Implementation Process
Preparation: Contractor drafts based on project scope.
Review: Consultant provides feedback.
Approval: Finalized for quality control.
Monitoring: Used to track inspections and tests.
Modifications: Consultant approval is required for changes.
ITP & Inspection Requests
📌 Work Inspection Request (WIR): Ensures each activity is inspected per the ITP.
📌 Material Inspection Request (MIR): Confirms materials meet specifications.
📌 Testing Reports: Verifies compliance with standards.
Conclusion
A well-structured ITP ensures quality assurance, regulatory compliance, and risk mitigation in construction. When integrated with WIRs, MIRs, and quality control protocols, it enhances efficiency and project success.